Back to telecons

76th telecon 1/15/2009

Participating: Michele, Shane, Ed, Neil

  • Michele tells what happened at LIST. Plans for challenges:
    • MLDC “for students” (1C).
    • MLDC 4 with big enchilada (all MLDC 3 sources, more of them, one set, 2 years, higher sampling rate, released summer 2009, 1 year to do it), will encourage cross-institution collaboration.
    • MLDC 5 with more realistic instrument noise (released after decadal).
  • Parallel task force starting on realistic instrument characterization with LPF people. Neil suggests we should be represented. Michele will attend/organize
  • Ed/Shane: could release MLDC 5 halfway through MLDC 4? Michele: that’s OK, we’ll have to see how the noise sources, etc., develop
  • Will need to move telecon to accommodate more people, run poll
 
/home/web/dokuwiki/data/pages/listwg1b/agenda76.txt · Last modified: 2009/01/15 08:32 by vallis
 
Recent changes RSS feed Creative Commons License Donate Powered by PHP Valid XHTML 1.0 Valid CSS Driven by DokuWiki